Bangladesh
Government has taken a solar energy development programme in the Chittagong hill tracts
area. These projects are being financed by the fund allocated from the hill tracts
ministry. The project is constituted by 2(two) phases. The first phase has already been
completed in Juraichhri area of Rangamati district. As many as 400 nos of solar panels
have been installed there. Installation work
of the 2nd phase has also been taken up in Thanchi Upozila of Rangamati
district. About 400 nos of panel has been installed there within last 6 months. The total
project includes, 600 Solar Home Systems of 120 Wp each, 20 sets Solar PV Street Light
Systems of 75 Wp each, 2 set Solar PV Submersible Water Pumps of 50,000 liters per day
lifting capacity of each pump of 1800 WP(15X120Wp)
each, 6 Sets of Solar PV Vaccine Refrigerators for the Health Care Centers of 360
Wp(3X120Wp) each .1 Sets of 10 KW Centralized AC Market Electrification Systems for the
electrification.
Another
Solar Electrification project is going on at Thanchi Upozila at Rangamati district. It
consists 600 Sets Solar Home system of 120 Mp each, 2 Sets of Solar PV Vaccine
Refrigerators for the Health Care Centers of 360 Wp(3X120Wp) each , 10 sets Solar PV
Street Light Systems of 75 Wp each, 1 set Solar PV Submersible Water Pumps of 50,000
liters per day lifting capacity of each pump of 1800
WP(15X120Wp) each.
Bangladesh government has taken up a project
for installation of 8 x 225 KW wind mills in different places of coastal area. Before
installation of wind mill,s a wind profile survey program was taken up in the financial
year 2003-04. The source of fund was from GOB won resource. Although a fund of about 1.9
crore has been allocated by the government for the installation of wind measuring towers
and wind study, no such fund was allocated for installation of wind mills. Bangladesh
power Development Board has taken up a pilot project for installation of 4x225 KW wind
energy power station at Muhuri Dam area of feni district
from its own source of revenue fund. The machines have already been installed there.
Provisional test run shows satisfactory performance of the mills. These machines were
hooked up with nearby REB 11 KV feeder . 4 nos of wind measuring tower at a hight of 50
meters were installed at Muhuri Dam (feni), Moghnama ghat (Cox-bazar), Purki Saikat
(Patenga) and Kuakata area. The speed and direction of wind is being measured by two
anemometers in each place at a hight of 30
and 50 meters respectively. A comparative and
comprehensive study of the data available shows that there exist a satisfactory potential
of installation of wind mills in Bangladesh.
A project has been taken from BPDB own fund
at Kutubdia island named 1000 KW Wind-Battery Hybrid Power Plant Project.
Tender evaluation is under process for this project.
Some small potential of mini hydro power
generation are available in hill tracts area of Bangladesh. At Borcol area of Rangamati
district a 50 KW generator has been installed. No fund has yet been allocated from the
government for this purpose. BPDB has completed a pilot project for installing 1x 50 KW
mini hydro plant at Borcol water fall from its own revenue fund.
4. CFL (compact florescent lamp)
Bangladesh government has allocated an amount
of 1(one) crore taka from its own source of fund against greater Chittagong power
distribution project. A comprehensive study
on the requirement and capacity of the lamps was completed. According to the requirement
21000 nos of 23 watt and 3000 nos of 14 watt lamp have already been procured and
installed.
There is a good prospect of sugar
Co-generation power plant installation in 50 sugar mills in Bangaladesh. If government allows and allocate fund for
feasibility study and there after
installation of as many as 10-15 nos. of generator having 10-15 MW capacity each in the
northern zone of Bangladesh. where maximum
numbers of bagasse could be available from the sugar mills. This type of generation will
help minimizing the low voltage problem in the remote and national grid. Cost will also be
economical compared to the cost of generation of electricity by using fuel oil.