Key Statistics
.

Total Generation Report

Power Development Board

Forecast
(06/07/15)
6406.00 8300.00
Actual
(05/07/15)
6521.00 8032.00

Opinion about National Grid Failure

Webmail

Chairman Message

 

Zonal Map

Contact

Font Help

Download Unicode Bangla Font.

BPDB Employees Samity

 



Key Statistics
Present Installed Generation Capacity (MW) as on  June, 2015.

Public Sector
 Installed Generation Capacity (MW)
 BPDB 4126
APSCL
827
EGCB
622
NWPGCL
368
RPCL
77
Subtotal
6,020 (52%)
Private Sector


IPPs
2536
SIPPs (BPDB)
99
SIPPs (REB)
251
15 YR. Rental
167
3/5 YR. Rental
1959
Power Import
500
                        Subtotal
5,512 (48%)
                        TOTAL
11,532


MAXIMUM DEMAND SERVED FAR

8,032 MW

05-07-2015

TRANSMISSION LINES (400 kV)

TRANSMISSION LINES (230 kV)

165 Ckt. K.M

3066 Ckt. K.M

 FY-2014

 FY-2014

TRANSMISSION LINES (132 kV)

6305 Ckt. K.M

FY-2014

GRID SUB-STATION CAPACITY (400/230/132 kV)

GRID SUB-STATION CAPACITY (230/132 kV)

500 MVA 

 9325 MVA

FY- 2014

 FY- 2014
GRID SUB-STATION CAPACITY (132/33 kV)   12,893   MVA FY- 2014

DISTRIBUTION LINES (33 kV & BELOW) (only BPDB)

38,934 K.M

FY-2014


CONSUMER NUMBER

29,01,235

FY-2014







 

 

 

Awareness

Special Notices

 

Visitors Counter

1042598
TodayToday108
YesterdayYesterday1788
This WeekThis Week7251
This MonthThis Month12340
Total HitsTotal Hits1042598
Guests 7

BPDB Store

 

antalya escort antalya escort antalya escort ankara escort